CI Pipeline with Test Management / 🧪 Run Tests & Generate Reports (push) Waiting to run
CI Pipeline with Test Management / 🐳 Docker Integration Tests (push) Blocked by required conditions
CI Pipeline with Test Management / 🏗️ Build Docker Image (push) Blocked by required conditions
CI Pipeline with Test Management / 📊 Generate Test Summary (push) Blocked by required conditions
Test Reporting & Gherkin Analysis / 🧪 Run Tests & Generate Reports (push) Waiting to run
Test Reporting & Gherkin Analysis / 📊 Analyze Test Coverage (push) Blocked by required conditions
Test Reporting & Gherkin Analysis / 🔄 Sync with Linear (push) Blocked by required conditions
Test Reporting & Gherkin Analysis / ⚡ Performance Monitoring (push) Blocked by required conditions
Following the MITHOME-118 scope decision (cancelled — see Plane comment): partner logos are prepared with a free external tool (e.g. remove.bg) before upload, not edited inside Payload admin. Surface that expectation right on the field so an editor isn't looking for a crop/transparency tool that doesn't exist. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>